Monday, February 19, 2007

Here are some pics of the seat fitted as well as the dash in. We were looking at the steering setup and it needs to be tweaked, so pics too come. enjoy.


Here are some pics of the Finished floor. It was done last week, but I was too forgetful to take the camera over and get some pics. The only thing that needs done is the boxes on either side. Little boxes for tools or what not.







Thursday, February 08, 2007

This week has been -4˚ so now work as of yet. I do need to head over tonight and fix some things on the floor. But all in do time.

Thursday, February 01, 2007

Ryan and I started the Tunnel, and Kyle and I got a lot more done last night. All I have to do tonight is fabricate where it meets the firewall and we should be good to go. I hope to have this done and get the floor buttoned up tonight. I made a goal of getting it done by feb. 1st, and I hope I can do it. But overall it looks really good. and I'm proud of all the help I got and the work everyone has put into it. Thanks you guys.



Fun with fitting the seat.
Ryan and I had a few laughs. hahahahahaha stop it.



Ryan started stripping the bed.


Here are pics of the floor as of 1/25/07. I cannot seem to grasp the progession of the floor, but hopefully the viewers can.